Open a Microsoft Project File (.mpp)
No Project needed: see the tasks, dates and resources in your browser, save them as Excel or CSV, or print them to PDF. The file is not sent anywhere.
Your files stay safe — processed entirely in your browser. Nothing is uploaded.
Drop a .mpp file here
or click to choose it (Microsoft Project files and templates: .mpp, .mpt)
Read in your browser — the file is not uploaded
How to open an MPP file without Project
A .mpp file is a Microsoft Project plan: tasks with their dates and durations, how they depend on each other, and the people and things assigned to them. Project is sold on its own, so a computer with Word and Excel often has nothing that opens it. This page shows what the file holds.
The file is read in this browser and not uploaded.
Add the file
Drop the .mpp into the box above, or click to choose it. Templates (.mpt) open too.
Read the tasks
The table lists the tasks with their outline (click ▾ to close a summary task, or use Expand all / Collapse all), duration, start, finish, % complete and predecessors (by ID). Milestones have a ◆. The Gantt chart beside it draws each task’s dates; on a phone, switch between the table and the chart.
See the resources and the project’s information
Resources lists the people, materials and costs; Project information shows the title, author, company, start and finish, and when the file was created and last saved.
Save or print
Save as Excel gives a workbook with the tasks, the resources and the project’s information on three sheets; CSV gives the task table. Print / PDF prints the table with a bar chart; choose “Save as PDF” in the print dialog to get a PDF.
The schedule is shown as it is saved in the file: nothing is recalculated, and the bars are drawn from the start and finish dates (Project’s own bar styles, links between bars, filters and views are not reproduced).
How this viewer works
The file is read in your browser, in a separate worker, by MPXJ — an open-source library that reads Microsoft Project files — turned from Java into JavaScript with TeaVM. Nothing is sent to a server.
- What is read
- The reader hands over the project as data: tasks (outline, dates, duration, % complete, predecessors, notes, assigned resources), resources and the project’s information. This page builds the table and the Gantt chart from that data and puts the file’s text in only as text.
- Large projects
- Only the rows in view are drawn, so a long plan scrolls smoothly. Up to 50,000 tasks and 20,000 resources are read; longer names and notes are shortened, and the page says when anything was left out.
- Limits on what is read
- Reading stops after 30 seconds, and the worker is then discarded with its memory, so a damaged file cannot leave the page stuck. MPXJ (LGPL 2.1), Apache POI, TeaVM and the other parts: licenses, changes and the material to rebuild
Limits
Files over 100 MB (30 MB on a phone or tablet) are not opened. Password-protected files, Project 4.0 and 95 files, and Project’s XML and MPX files do not open. Costs, work, baselines, calendars and custom fields are not shown. Files made by a Japanese edition of Project have not been tried yet.
Frequently asked questions
Is my file uploaded?
Which Project files open?
Can I edit the plan?
Why are there no arrows between the bars?
When were the created and last saved times?